Vintage

Something Different for Joomla

CHWI News Delivered to You!

Free Building Tips

Sign up for our FREE monthly newsletter and receive...

  • Open house dates
  • Seminar announcements
  • Cost saving design ideas
  • Tips on buying property
  • Sample floor plans & pricing

Your email address and contact information will be kept private.
 

Satisfied Clients

"Invaluable Advice"

Years after Cedar Homes of Washington received my last payment, they continue to provide me with invaluable design and finishing advice. They have always been eager to help and really took an interest in me and my project. They have done a fantastic job and continue to give excellent customer service and support.

-- Gordon Moll

 
Completed Homes
Construction Finished on Duvall Cedar D-Log Home Print E-mail

Custom Staircase
Custom Staircase
Cedar Log Home with a View
March 20, 2006: Ready for stain

 

 


Construction has been completed on a 3,300 sf custom home near Duvall, WA. This home features an attached 3-car garage (which is sided to match the home), along with four window bays to take full advantage of Mt. Rainier views and the surrounding horse acreage.

Custom details make all the difference, as you can see with the custom stairs in this home. Several interior walls are stud framed with sheetrock. The white walls brighten the interior of the home.

The slideshow below shows the actual construction of this home. The video requires Flash Player 8. If you do not have Flash Player you can download it free from Adobe.



 

 
Snowmobiler Retreat Print E-mail

Cedar Log Cabin RetreatLake Wenatchee mountain getaway cabin. This design is a modified Cutter with 1,084 sf on both the main and basement levels. The covered porch wraps around three sides of the home.

 
Modified Schooner Completed In Monroe Print E-mail
Cedar Home Under Construction
Day 6

First floor timbers and midfloor installed.
Cedar Home Under Construction
Day 7

Prow post and second floor walls are up.
Cedar log home under construction
Day 9

Roof system and sheathing installed.
cedar home under construction
Day 14

Dormers sided, soffits and fascia installed.
cedar home completed
Day 30

Doors and windows installed. Prow siding completed.
   


A 2,400 sf modified Schooner was delivered to Monroe, WA. Builders arrived the same day and installed the mudsill onto the perimeter concrete foundation.

The homeowners selected our laminated cedar timbers (Phoenix System) as their wall system. This home has a "prow front" Great Room / Kitchen / Dining area.

This home was project managed by a mother / daughter team.

 
Construction Completed On Remote Alaska Fishing Cabin Print E-mail

This prow-front style, 1500 sf chalet will be used as a corporate fishing retreat.

Click image to open!
Click image to open!
Click image to open!
Click image to open!

 
<< Start < Prev 1 2 3 Next > End >>

Results 5 - 8 of 10