Vintage

Something Different for Joomla

CHWI News Delivered to You!

Free Building Tips

Sign up for our FREE monthly newsletter and receive...

  • Open house dates
  • Seminar announcements
  • Cost saving design ideas
  • Tips on buying property
  • Sample floor plans & pricing

Your email address and contact information will be kept private.
 

Satisfied Clients

"So Wonderful"

We just wanted to thank you so much for being so wonderful in helping us build our home. We know the home package could have been a stressful part, but it wasn't at all - thanks to you.

-- Rob & Mary Stumph

 
Under Construction
Waterfront Cedar Home Print E-mail
cedar home under construction
 First timbers are being placed..
cedar home under construction
Main Level is well underway.
cedar home under construction
Beams, roof system and finish roofing installed.
cedar home under construction
Windows and doors and trim installed.
cedar home under construction
Interior finish work under way
   

 

This 2,480 sf modified Squire home has been completed and the homeowners are moving in. 

This homeowner hired a project manager to assist with the organization and construction of their home.

This home features our Phoenix System (5-lam timber wall) system, with vinyl insulated windows and high definition composition roofing.

Interior finishes include bamboo hardwood flooring, a stone-faced Great Room fireplace, Master Bedroom suite with jacuzzi tub and a handcrafted interior staircase.

 
Quilcene Cedar Home Addition Print E-mail
Cedar Home Addition  Foundation is in and construction has begun. 
 Cedar Home Addition First floor storage area is framed in.
 Cedar Home Addition Second level shop framing completed. Entryway framing begun.
 Cedar Home Addition With the exception of rails, the exterior addition is complete.
   
   

 

One of our cedar home owners is adding onto their home. They're project managing the construction of 650 sf of additional space. The addition will include storage on the lower level, shop space on the main floor and a libary on the third level. This is the third addition to this cedar home.

Watch this space for more progress photos!

 
Idaho Mountain Retreat Print E-mail
cedar home under construction
The crew is putting up the framed walls in the daylight basement.

cedar home under construction
The first floor timbers and midfloor have been installed.
 Cedar Home Under Construction
Roof system finished. Ready for metal roofing.
 Cedar home under construction
Metal roofing and sun porch completed. Ready for finishing work inside.
 

Construction is well underway on a 3,172 sf custom cedar home near Elk River, Idaho.

This home features a main level master bedroom suite and a huge kitchen / dining / great room area. The main level also includes a laundry, study and sewing room.

The upper level includes two bedrooms, bath and a loft overlooking the great room.

The basement level includes a garage, rec room, storage and shop.

Watch this space for more progress photos!

 
 
<< Start < Prev 1 2 3 4 Next > End >>

Results 13 - 15 of 15