 | The foundation is laid and the first load of materials have arrived on-site. |  | Floor joists are installed. Ready for the plywood subfloor. |  | First timbers are placed between laminated columns. |  | Main level floor completed. |  | Midfloor installed and second floor framing completed. |  | Glue lam beams and roof system installed. |  | Finish roofing installed, deck and fireplace completed. |
|