Vintage

Something Different for Joomla

CHWI News Delivered to You!

Free Building Tips

Sign up for our FREE monthly newsletter and receive...

  • Open house dates
  • Seminar announcements
  • Cost saving design ideas
  • Tips on buying property
  • Sample floor plans & pricing

Your email address and contact information will be kept private.
 
Pre-Construction Timeline Print E-mail

Preparation For Building:

Note: This timeline represents only a suggested path. Each homeowner may approach their project differently and have special building or land development considerations. Cedar Homes of Washington will assist the homeowner to organize their own building project and timeline.

  • Development of preliminary blueprints
  • Pre-qualify for financing & bank selection
  • Water - (hook ups or well drilling)
  • Septic - (drainfield design apprvd. by Health Dept.)
  • Check for:
    • Building covenants
    • Wetlands
    • Easements
    • Setbacks
    • Critical Area designation
    • Road or school mitigation fees (paid in addition to permit fee)
    • Fire code building requirements

     
  • Determine construction method (owner/bldr., project mgr. or contractor)
  • Blueprint revisions
  • Stake out home at jobsite
  • Review slope for basement
  • Preliminary plans to subcontractors for bids

     
  • Final plans complete with Engineer stamp (if required)
  • Submit forms required by bank for financing approval
  • Develop plot plan
  • Submit plans & paperwork to county for permit

     
  • Approval of permit
  • Approval of financing with letter of commitment from lender
  • Sign final blueprints & give cutting approval

     
  • Excavation of site
  • Foundation & plumbing (basement)
  • Temporary power pole at jobsite

     
  • Forklift or boom truck arrives at site
  • Home package arrives at site
  • Inventory by Cedar Homes of Washington  
  • Construction Begins