Poulsbo Home Addition

These homeowners are project managing an 850 sf addition to their existing home.  The addition is built with our laminated cedar timber wall system.

The added space will include a new kitchen and rec room.

The timber walls were up in about one day.

The homeowners sided over the dormer on their existing home -- to match the timber walls on the addition.

Plans call for new roofing for both the existing home and addition.

The total time elapsed from the installation of the floor system to the roof system was about 10 days.

What Our Clients Are Saying...

"Unlocking Our Dream"

Mike and Judy Flanagan were the key to unlocking our dream of designing and building a home of a lifetime. Without their patience, enthusiasm, and commitment to providing information, insight and guidance through the entire custom home process, from conceptualization through construction, we would still be just dreaming. As trying an experience as being an owner/builder is, we have many wonderful memories and would in fact love to do it all again. We're sure that result has as much to do with our relationship with Mike and Judy as it does with anything else.

-- John and Laura McGrath