The Cedar Home Construction Process

1. The foundation is laid and the first load of materials have arrived on-site.

2. Floor Joinsts are installed. Ready for the plywood subfloor.

3. First timbers are placed between laminated columns.

4. Main level floor completed.

5. Midfloor installed and second floor framing completed.

6. Glue lam beams and roof system installed.

7. Finish roofing installed, deck and fireplace completed.