The Cedar Home Construction Process

The foundation is laid and the first load of materials have arrived on-site.

1. The foundation is laid and the first load of materials have arrived on-site.

Floor joists are installed. Ready for the plywood subfloor.

2. Floor Joinsts are installed. Ready for the plywood subfloor.

 
First timbers are placed between laminated columns.

3. First timbers are placed between laminated columns.

Main level floor completed.

4. Main level floor completed.

 
Midfloor installed and second floor framing completed.

5. Midfloor installed and second floor framing completed.

Glue lam beams and roof system installed.

6. Glue lam beams and roof system installed.

 
Finish roofing installed, deck and fireplace completed.

7. Finish roofing installed, deck and fireplace completed.